Zoning determines whether a use is permitted. Subdivision and land development review determines how the site is engineered: access, stormwater, utilities, lighting and landscaping. They are separate processes governed by separate ordinances, and approval under one does not resolve the other.
Two different ordinances
Municipalities adopt a zoning ordinance and, separately, a subdivision and land development ordinance. Zoning governs use and dimension. Land development governs the engineering of the site.
A project can be permitted under zoning and still fail land development review, and confusing the two is a common source of delay and cost.
The sequence
- Sketch plan, informal and optional, and usually the cheapest hour you will spend.
- Preliminary plan, the substantive review, before the planning commission and then the governing body, with county planning comment.
- Final plan, addressing conditions from preliminary approval.
- Recording, within the required period after approval.
Some municipalities allow a combined preliminary and final process for simpler plans, which is worth asking about.
What review actually covers
- Street layout, access, sight distance and, where a state road is involved, a highway occupancy permit.
- Stormwater management, which is frequently the largest engineering cost and the most common source of revision.
- Sewage and water, including planning module approval.
- Lot layout, easements and rights of way.
- Landscaping, buffering, lighting and open space.
- Erosion and sedimentation control through the conservation district.
Conditions, improvements and financial security
Approvals routinely require public improvements: roads, stormwater facilities, sidewalks, sometimes offsite work. Municipalities generally require financial security to guarantee completion, released as work is completed and inspected.
Two things to watch. Whether required improvements are proportionate to the impact of your development, since disproportionate exactions are challengeable. And the release process, because security tied up long after work is complete is a real cost.
Time limits protect you
Pennsylvania imposes deadlines for deciding plans and communicating decisions, with deemed approval as a consequence of failure. The provisions are technical and strictly construed. Track every submission date, every extension you grant, and get any extension request in writing, because informally agreeing to wait can quietly surrender the protection.
The attorneys who handle these cases
Every one of these bar numbers is searchable on the Pennsylvania Disciplinary Board register. The person who takes your call is the person at your hearing.
-
Kenneth R. Schuster
Founding Member
Read Kenneth’s background -
Justin M. Bernstein
Associate
Read Justin’s background -
Christopher D. Gasda
Associate
Read Christopher’s background -
Anthony S. Pinnie
Of Counsel
Read Anthony’s background -
Joseph J. Jachetti
Associate
Read Joseph’s background -
Andrew Valentin
Associate
Read Andrew’s background
Questions people ask us about this
What is the difference between zoning and land development review?
Zoning determines whether a use is permitted and the dimensional limits. Subdivision and land development review determines how the site is engineered: access, stormwater, utilities, lighting and landscaping. They are separate ordinances and approval under one does not resolve the other.
What does the review actually look at?
Street layout and access including highway occupancy where a state road is involved, stormwater management which is usually the largest engineering cost, sewage and water planning, lot layout and easements, landscaping and buffering, and erosion control through the conservation district.
Why is stormwater always the problem?
Because it drives site layout, consumes developable area and carries continuing maintenance obligations, and requirements have tightened considerably. It is the most common reason plans go back for revision, which is why it is worth engineering early rather than late.
They are requiring offsite road improvements. Is that allowed?
Required improvements should be proportionate to the impact of your development. Disproportionate exactions are challengeable, and it is far easier to raise proportionality before agreeing to a condition than to unwind it afterwards.
How long can the municipality take?
Pennsylvania imposes deadlines for deciding plans and communicating decisions, with deemed approval as the consequence of failure. Track every date, and put any extension in writing, because informally agreeing to wait can quietly surrender that protection.
Both Delaware County offices
Walk in, or call. Both are answered 24 hours.
Media Head office
334 W Front StMedia, PA 19063
Open 24 hours
4.7 from 135 Google reviews
Serving central, north and west Delaware County.
Chester Satellite
405 Avenue of the StatesChester, PA 19013
Open 24 hours
5.0 from 5 Google reviews
Serving south and riverfront Delaware County.
Tell us what happened
Two questions to start. No contact details until the second step, and nothing you send here commits you to hiring us.
- You pay nothing unless we recover for you
- A named attorney reads every case review
- Both offices answer 24 hours, so you can call instead
Would rather talk now? (610) 601-2980